A small, dated shower is something you notice every single morning. The tile is stained, the door leaks or the stall is so tight you bump your elbows. We tear it out, fix anything the water has damaged and build a shower that fits the room and the people using it.
When You Need a Shower Remodel
Cracked tile, crumbling grout, loose fixtures and water stains outside the shower all mean water is getting behind the walls. Mold that keeps coming back is another sign. The longer it goes, the more framing and subfloor has to be replaced.
Some showers aren't failing, they're just wrong for the house. A tub nobody uses could be a walk-in shower. A cramped stall could be bigger. One homeowner's 1978 "shoebox" shower became the shower they'd always wanted.
A good shower should fit the people using it. If someone in the house has trouble stepping over a tub wall, that alone is a reason to change it. If you want a niche for bottles, a bench or a handheld sprayer, those are much easier to add when the walls are already open.
Our Shower Remodels Process
We come out, look at the shower and the room around it, and talk through the size, layout, tile and fixtures you want. You get an estimate within a few days.
Once the plan and materials are set, we demo the old shower down to the studs, repair any rotted framing or subfloor and update the plumbing as needed. Then we waterproof, tile and set the new fixtures and glass. We check in with you on site every day. A shower is usually part of a bathroom job that takes about two to three weeks.
Before work starts, every choice is made: tile, grout color, valve, fixtures and glass. That way the crew works straight through with no down days waiting on a decision or a delivery.
Shower Remodels Cost in Virginia Beach
Price depends on the size of the shower, whether a tub is coming out, the tile you choose, the valve and fixtures, and glass. Moving the drain or valve adds plumbing work. Rot behind old tile is a common surprise, and we show it to you before we fix it. Your estimate lists the full cost up front, with no hidden fees.
When you accept the estimate, we take a 50% deposit and schedule the work. The balance is due when the shower is finished, the punch list is done and the bathroom is clean. If you change something mid-job, we're happy to do it, but we'll tell you first how it affects the price and timeline.
Why Choose Us
We're Virginia Class A licensed, locally owned, and rated 5.0 on Google. When that 1978 shower came with a tight deadline before the house sold, the family said we didn't miss it. Every shower comes with a one-year warranty on workmanship and materials.
We're on site with you two or three times a day while the work is going, so you always know where things stand. We're a Virginia Class A residential building contractor with over 35 years of combined experience.